CUASAR AI DC 300 MW - DURANGO - MÉXICO
Power-Ready Development Zone — Purpose-Built for AI Inference at Scale
Structured as a Power-Ready Development Zone with direct access to a 300 MW-capable 230 kV grid connection point backed by an issued CENACE feasibility study, Durango is designed to shorten the path from land control to AI-ready capacity — with land use, water, CONAGUA and INAH clearances already resolved, so operators can deploy AI inference infrastructure without carrying the multi-year burden of grid interconnection, permitting, and site engineering themselves.